wasm-demo/demo/ermis-f/Notes/cur/13077711.1075855486766.Java...

166 lines
5.6 KiB
Plaintext

Message-ID: <13077711.1075855486766.JavaMail.evans@thyme>
Date: Fri, 10 Nov 2000 09:29:00 -0800 (PST)
From: enron.announcements@enron.com
To: houston.report@enron.com
Subject: SUPPLEMENTAL Weekend Outage Report for 11-10-00
Mime-Version: 1.0
Content-Type: text/plain; charset=us-ascii
Content-Transfer-Encoding: 7bit
X-From: Enron Announcements
X-To: Houston Outage Report
X-cc:
X-bcc:
X-Folder: \Frank_Ermis_Dec2000\Notes Folders\Notes inbox
X-Origin: Ermis-F
X-FileName: fermis.nsf
------------------------------------------------------------------------------
------------------------
W E E K E N D S Y S T E M S A V A I L A B I L I T Y
F O R
November 10, 2000 5:00pm through November 13, 2000 12:00am
------------------------------------------------------------------------------
------------------------
SCHEDULED SYSTEM OUTAGES:
ARDMORE DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages.
AZURIX: No Scheduled Outages.
EB34 DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages.
EDI SERVER: POSTPONED
Impact: EDI
Time: Sat 11/11/2000 at 11:00:00 PM CT thru Sun 11/12/2000 at 1:00:00 AM CT
Sat 11/11/2000 at 9:00:00 PM PT thru Sat 11/11/2000 at 11:00:00 PM PT
Sun 11/12/2000 at 5:00:00AM London thru Sun 11/12/2000 at 7:00:00 AM London
Outage: EDI HUB DISK VOLUME INCREASE
Environments Impacted: Corporate
Purpose: Continued EDI volume increases require the addition of more disk
space for EDI operations.
Backout: Utilize current configuration w/o new HACMP configuration
Contact(s): Jack Metkus
Jim Nelson 3-7799 713-327-2007
Karen O'Grady 5-7149 713-327-4805
Jack Metkus 3-0362 713-288-0743
EI: SEE ORIGINAL REPORT
ENRON NORTH AMERICAN LANS: No Scheduled Outages.
FIELD SERVICES: No Scheduled Outages.
INTERNET: ALSO SEE ORIGINAL REPORT
Impact: eol
Time: Fri 11/10/2000 at 6:00:00 PM CT thru Fri 11/10/2000 at 7:00:00 PM
CT
Fri 11/10/2000 at 4:00:00 PM PT thru Fri 11/10/2000 at 5:00:00 PM PT
Sat 11/11/2000 at 12:00:00 AM London thru Sat 11/11/2000 at 1:00:00 AM
London
Outage: eol net change
Environments Impacted: EOl
Purpose:
We have found that IP multicast storms on the EOL internal subnet 172.16.21.0
briefly incapacitate the EOL firewall eolfw1. To solve the problem, we will
insert a new VLAN/subnet 172.16.23.0 between 172.16.21.0 and the firewall so
that no IP multicast traffic will reach the firewall interface. Physical
work includes running two copper cables from trd-cx[12]-3405 port 6/7 to
eolfw1 and logical work entails defining the new VLAN on the
switches/routers, enabling interface vlan23 and changing
ip route 192.216.56.0 255.255.255.0 172.16.21.4
ip route 192.216.57.0 255.255.255.0 172.16.21.4
to
ip route 192.216.56.0 255.255.255.0 172.16.23.4
ip route 192.216.57.0 255.255.255.0 172.16.23.4
on the routers, and replacing
route inside 10.0.0.0 255.0.0.0 172.16.21.1 1
route inside 172.16.0.0 255.242.0.0 172.16.21.1 1
route inside 192.168.0.0 255.255.0.0 172.16.21.1 1
with
route inside 10.0.0.0 255.0.0.0 172.16.23.1 1
route inside 172.16.0.0 255.242.0.0 172.16.23.1 1
route inside 192.168.0.0 255.255.0.0 172.16.23.1 1
on eolfw1.
Backout:
Contact(s): Anchi Zhang 713-853-5464
LOTUS NOTES: No Scheduled Outages.
MARKET DATA: No Scheduled Outages.
NT: No Scheduled Outages.
OS/2: No Scheduled Outages.
OTHER SYSTEMS: ALSO SEE ORIGINAL REPORT
Impact: CORP
Time: Sat 11/11/2000 at 8:30:00 AM Buenos Aires thru Sat 11/11/2000 at
5:00:00 PM Buenos Aires
Sat 11/11/2000 at 5:30:00 AM CT thru Sat 11/11/2000 at 2:00:00 PM CT
Sat 11/11/2000 at 3:30:00 AM PT thru Sat 11/11/2000 at 12:00:00 PM PT
Sat 11/11/2000 at 11:30:00 AM London thru Sat 11/11/2000 at 8:00:00 PM
London
Outage: Maintenance electricity
Environments Impacted: ESA - Buenos Aires
Purpose: Electrical security
Backout: Back to the original project.
Contact(s): Ariel Bruch
Nilson Busto 55-11-5503-1347 office
55-11-9233-7481 cel
Impact: ESA
Time: Sun 11/12/2000 at 2:30:00 PM Brazil thru Sun 11/12/2000 at 6:00:00
PM Brazil
Sun 11/12/2000 at 10:30:00 AM CT thru Sun 11/12/2000 at 2:00:00 PM CT
Sun 11/12/2000 at 8:30:00 AM PT thru Sun 11/12/2000 at 12:00:00 PM PT
Sun 11/12/2000 at 4:30:00 PM London thru Sun 11/12/2000 at 8:00:00 PM
London
Outage: Maintenance to the electrical systems
Environments Impacted: Sao Paulo Office
Purpose: Security maintenance
Backout: Back to the original project.
Contact(s): Nilson Busto 55-11-5503-1347 office
55-11-9233-7481 cel
SITARA: No Scheduled Outages.
SUN/OSS SYSTEM: No Scheduled Outages.
TELEPHONY: SEE ORIGINAL REPORT
TERMINAL SERVER: No Scheduled Outages.
UNIFY:
Impact: CORP
Time: Fri 11/10/2000 at 6:00:00 PM CT thru Sat 11/11/2000 at 8:15:00 AM CT
Fri 11/10/2000 at 4:00:00 PM PT thru Sat 11/11/2000 at 6:15:00 AM PT
Sat 11/11/2000 at 12:00:00 AM London thru Sat 11/11/2000 at 2:15:00 PM
London
Outage: Unify
Environments Impacted: Unify Users
Purpose: For better I/O performance
Backout: Restore the database with the backup
Contact(s): Jaikishore Bharathi 713-853-0347
------------------------------------------------------------------------------
-------------------------------------------------------
FOR ASSISTANCE
(713) 853-1411 Enron Resolution Center
(713) 853-5536 Information Risk Management
Specific Applications Help:
Unify On-Call (713) 284-3757 [Pager]
Sitara On-Call (713) 288-0101 [Pager]
RUS/GOPS/GeoTools/APRS (713) 639-9726 [Pager]
OSS/UA4/TARP (713) 285-3165 [Pager]
CPR (713) 284-4175 [Pager]
EDI Support (713) 327-3893 [Pager]
All Other Systems (713) 563-5797 [Pager]
or (713) 563-5987 [Pager]